Case-Studies

In this world of demanding clients, SGA brings a project management team to the table to complete the project.

 

Assisting in projects starting at the drawing board all the way to completion, based at our head office in Blackburn the Estimators, Draughtsmen, Procurement and Project managers working together to an excellent level, provide the customer with the best service for miles to ensure their product is completed to the highest standard and specification possible.

 

For each individual project, a Project Manager is assigned to ensure that that customers' expectations are met to the highest degree. They, including, the rest of the team, understand the need to respond efficiently and flexibility to manage each project when the unexpected occurs.

 

This is all to aid towards completion of each project on time, in time to each client's budget to the highest specification possible regardless of how big or small a single project is.

  • Tauheedul Islam Girls High School

    Formally a Humantities College, this school has been transformed into an all girls High School with a main entrance using an aluminium framing system. Using a mixture of various Kawneer alumimium and dual coloured spectrums elite 70 PVC window systems, this school has been given a much needed modern update.

    Products: ACS 40 FSG Framing, ACS 10D Door , AA541 Windows, AA110 Curtainwall

    Contractor: Balfour Beatty

    Location:Blackburn

    Value:£375,000

    Completion:28 Jun 2013

  • Kingsway Park School

    As an amalgamation of Balderstone Technology College & Springhill High School, this school was built as a combination of a brand new build & refurbishment of an existing build to create a new educational development know as Kingsway Park High School. Kingsway Park School is a mixed secondary school which is part of the Building Schools for the Future Scheme introduced by Blair’s Government to...

    View More

    Products: 190/350 Door, AA541 Windows, AA100 Curtainwall, AA100 SSG Curtainwall

    Contractor: Carillion Group

    Location:Rochdale

    Value:£566,000

    Completion:28 Feb 2013

  • Manchester Air Traffic Control Tower

    As a brand new build, the new Manchester Airport Control tower towers 60 metres about the two runways. Built to replace the old tower, this new control tower has state of the art technology to guide the various aeroplanes' arrivals and departures to the rest of the world and is the latest in a line of improvements to the airport since it opened its doors in 1983. Using Schuco's FW60+ Curtain...

    View More

    Products: FW60+ Curtainwalling, AWS 70 Window

    Contractor: Morgan Sindall

    Location:Manchester Airport

    Value:£160,000

    Completion:22 Jan 2013

  • Entrance
    Witton Park High School

    Originally a traditional red brick building, it was used as a girls grammar school before converting into a comprehensive in the last 1960's, this school has been tansformed into a work of art. In 2011, the cramped, dark and damp old buildings were torn down to make way for the new light, spacious and ultra modern high school. Combining the features such as Kawneer's AA100 Curtain Walling...

    View More

    Products: AA541 Windows, 190/350 Door, AA100 Curtainwall, AA541 Windows

    Contractor: Balfour Beatty

    Location:Blackburn

    Value:£710,000

    Completion:25 Nov 2012

  •  Park Hill Finished
    Park Hill

    Construction of the original Park Hill began in 1957 and by 1961, 998 flats were built. It became a desirable place to live as the concept of the flats being 'streets in the sky' proved popular to many around the area. The idea that a milk float delivering fresh milk to your doorstep each morning appealed to people living there as it has the innovative feature of external decks (or streets)...

    View More

    Product: AA3110 Sliding Window System

    Contractor:

    Location:Sheffield

    Value:£2,200,000

    Completion:13 Jul 2011

Page 2 of 6