Case-Studies

In this world of demanding clients, SGA brings a project management team to the table to complete the project.

 

Assisting in projects starting at the drawing board all the way to completion, based at our head office in Blackburn the Estimators, Draughtsmen, Procurement and Project managers working together to an excellent level, provide the customer with the best service for miles to ensure their product is completed to the highest standard and specification possible.

 

For each individual project, a Project Manager is assigned to ensure that that customers' expectations are met to the highest degree. They, including, the rest of the team, understand the need to respond efficiently and flexibility to manage each project when the unexpected occurs.

 

This is all to aid towards completion of each project on time, in time to each client's budget to the highest specification possible regardless of how big or small a single project is.

  • Oldham College - Building A

    Oldham College has been established for over 120 years opening in 1893 as an Art & Science College for the town. Using Kawneer’s 190 doors, AA100 Curtain Walling and 350 doors, all seen as an ideal specification for a bustling education facility, Oldham College has been transformed and modernised to includes a state of the art learning centre with multiple classrooms and holding the main...

    View More

    Products: 190/350 Door, AA541 Windows, AA100 Curtainwall

    Contractor: Laing O'Rourke

    Location:Oldham, Manchester

    Value:£310,000

    Completion:1 May 2014

  • Tauheedul Islam Girls High School

    Formally a Humantities College, this school has been transformed into an all girls High School with a main entrance using an aluminium framing system. Using a mixture of various Kawneer alumimium and dual coloured spectrums elite 70 PVC window systems, this school has been given a much needed modern update.

    Products: ACS 40 FSG Framing, ACS 10D Door , AA541 Windows, AA110 Curtainwall

    Contractor: Balfour Beatty

    Location:Blackburn

    Value:£375,000

    Completion:28 Jun 2013

  • Kingsway Park School

    As an amalgamation of Balderstone Technology College & Springhill High School, this school was built as a combination of a brand new build & refurbishment of an existing build to create a new educational development know as Kingsway Park High School. Kingsway Park School is a mixed secondary school which is part of the Building Schools for the Future Scheme introduced by Blair’s Government to...

    View More

    Products: 190/350 Door, AA541 Windows, AA100 Curtainwall, AA100 SSG Curtainwall

    Contractor: Carillion Group

    Location:Rochdale

    Value:£566,000

    Completion:28 Feb 2013

  • Entrance
    Witton Park High School

    Originally a traditional red brick building, it was used as a girls grammar school before converting into a comprehensive in the last 1960's, this school has been tansformed into a work of art. In 2011, the cramped, dark and damp old buildings were torn down to make way for the new light, spacious and ultra modern high school. Combining the features such as Kawneer's AA100 Curtain Walling...

    View More

    Products: AA541 Windows, 190/350 Door, AA100 Curtainwall, AA541 Windows

    Contractor: Balfour Beatty

    Location:Blackburn

    Value:£710,000

    Completion:25 Nov 2012

Page 1 of 1